Working group last night saw Paul, Mark, Tom and Jon prepare for the lights and sockets in the outdoor classroom. The ducting across the drive now has a pull rope.
A low-energy alternative has replaced the outside light, although we might change the position of this and add a second light if, over time, we decide it is needed. When we complete another project, we should be able to change the cable to allow us to have a big red light on by the switch to hopefully minimise the chances of it being left on.
Paul also fixed the roof of the bike shelter.