Tom connected up the armoured cable from the building to the outdoor classroom, which Paul, Mark and Jon laid out and fed through the ducting and the wall. Paul and Mark clipped it to the wall.
Jon and Mark removed the old oil pipe which was replaced with a compliant one outside.
Various tidying and sorting also took place.